Contents
9 NON-COMPLIANCE,
COMPLAINTS, NOTIFICATIONS OF SUMMONS AND SUCCESSFUL PROSECUTIONS
10 IMPLEMENTATION
STATUS OF ENVIRONMENTAL MITIGATION MEASURE
12 CONCLUSION AND
RECOMMENDATION
Tables
Table 1 Contact Information of Key Personnel
Table 2 Environmental Licenses, Notification
and Permits Summary
Table 3 Air Quality Monitoring Equipment
Table 4 Air Quality Monitoring Location
Table 5 Summary of Air Quality Monitoring
Results
Table 6 Comparison of 1-hr TSP data with EIA
predictions
Table 7 Construction Noise Monitoring
Equipment
Table 8 Monitoring Parameters and
Frequencies of Noise Monitoring
Table 9 Construction Noise Monitoring
Location
Table 10 Summary
of Construction Noise Monitoring Results
Table 11 Comparison
of Noise monitoring data with EIA predictions
Table 12 Water
Quality Monitoring and Sampling Equipment
Table 13 Monitoring
Parameters and Frequency
Table 14 Coordinates
of Water Quality Monitoring Locations
Table 15 Summary
of Water Quality Exceedance
Table 16 Noise
Monitoring Parameters (For Active Ardeid Night Roost Survey)
Table 17 Active
Ardeid Night Roost Survey Findings
Table 18 Noise
Monitoring Parameters (For Active Ardeid Night Roost Survey)
Table 19 Noise
Monitoring Parameters
Table 20 Abundance
of all Avifauna Species
Table 21 Abundance
of Species of Conservation Importance
Table 22 Shannon
Diversity Index Value of all Avifauna Species
Table 23 Shannon
Diversity Index Value of Species with Conservation Importance
Table 24 Wetland
habitat utilization of all avifauna species
Table 25 Wetland
habitat utilization of avifauna species of conservation importance
Table 26 Noise
Monitoring Results (For Ecological Monitoring of Birds)
Table 27 Waste
Generated by the Construction and Disposal Ground
Table 28 Status
of submissions required under the EP
Figures
Figure 1 Location
of Proposed Yuen Long Effluent Polishing Plant
Figure 2 Location
of Construction Dust Monitoring Stations
Figure 3 Noise
Monitoring Locations
Figure 4 Water
Quality Monitoring Locations
Figure 5 Ecology
Monitoring Locations
Appendix
APPENDIX A CONSTRUCTION PROGRAMME
APPENDIX B PROJECT ORGANIZATION CHART
APPENDIX C ACTION AND LIMIT LEVELS
APPENDIX D CALIBRATION CERTIFICATES/ REPORTS OF
MONITORING EQUIPMENT
APPENDIX E ENVIRONMENTAL MONITORING SCHEDULE
APPENDIX F ENVIRONMENTAL MONITORING RESULTS
APPENDIX H EVENT AND ACTION PLAN
APPENDIX J IMPLEMENTATION STATUS OF ENVIRONMENTAL
MITIGATION MEASURES
APPENDIX K WEATHER AND METEOROLOGICAL CONDITIONS
APPENDIX M SUMMARY OF THE ET LEADER’S SITE
ENVIRONMENTAL AUDIT IN THE REPORTING MONTH
APPENDIX N OUTSTANDING ISSUES AND DEFICIENCIES
APPENDIX O ACTIVE NIGHT ROOST MONITORING AREA AND
VANTAGE POINTS; AND NOISE MONITORING STATIONS
APPENDIX P ECOLOGICAL BIRD MONITORING AREA WITH
LOCATIONS OF POINT COUNT SITES AND TRANSECT ROUTE